Capping Works

CONTRACT: Project Management and CQA on Capping works to a Landfill Site

The project involved the capping of a 20,000m2 landfill waste cell consisting of the installation of a 1mm LLDPE liner, Placement of a geotextile and restoration soils. Swan supplied Construction Quality Assurance via an on site engineer plus Project Management for the works. The works included all testing of the liner as indicated in the specification.

Swan prepared all of the Design documentation along with the CQA Plan and provided the CQA Report post completion.

Capping Works