Swan Environmental Services were commissioned by the client to provide Design, Principal Designer and CQA services for the capping of a 20,000m 2 landfill waste cell.
The works comprised:
-CQA supervision of the installation of a fully welded 1mm geomembrane lining system encapsulating the underlying waste cell
-CQA supervision of the installation of a protection geotextile directly over the geomembrane liner
-Scheduling of geotechnical testing of lining materials incorporated in the works
-Supervision of placement of restoration soils upon the geotextile protector
Swan provided a full time CQA Engineer to oversee all aspects of the works, under the guidance of a visiting project manager, and act as a contact between Client, Contractors and the Environment Agency.